INFRASTRUCTURE - An Overview
“A nutraceutical company runs on the wheels of innate energy fortified with the strength of courage and the ability to recognize that everything is possible”.
The facilities of Nutra has been set up in Chandrapadiya Village, Atmakur Taluk, Nellore District, Andhra Pradesh well connected by road on the Nellore - Mumbai Highway. The land in which the Industry has been set up measures is more than 35 Acres and presently only 3 Acres have been developed for the Industrial usage with well developed Interior roads and water drainage facilities.
Building
The Factory has been constructed with Class I Buildings with separate blocks for
> Administration
> Research & Development
> Quality Control
> Engineering workshop
> Raw Materials & Finished Goods Ware House.
> Utilities Block
> Effluent Treatment Plant
> Well Laid Internal Roads
> Compound Wall & Security Block
Plant & Production Facilities
The plant has been designed and set up for manufacture of multiple products with High quality Reactors and other Equipments with high degree of automation, GLRs SSRs and MSRs are put in to the use, in addition to this, one 100lit all glass system is also available. All these reactors are connected with individual condensers, sub coolers and receivers of SS316 MOC. Centrifuges, nutch filters, leaf filters, multimill, microniser, sifter and Blender of SS to meet the GMP.
Utilities
The plant is supported by a well balanced set of Utilities such as
> Boiler
> Brine (Methanol)
> Vacuum Compressed Air
> Cooling Towers, & Chilled water
> R.O Water,
> Chilling Water and Nitrogen Plant Facilities.
> Vertical storage and Underground storage tanks in 20 KL capacities with necessary Govt. approval.
> A very high standard Clean Room facility with suitable Air Handling Units for Finished goods and Packing section meeting cGMP Standards.
> Distillation column for the solvent recovery.
> High pressure column for Product separation and Purification SS316 MOC installed with metering pumps.
> Weighing bridge: 40 MT, Mettler Toledo.
Power
The unit has a total approval for 950 KVA with an existing power supply of 500 KVA which has a dedicated line to the Plant. In addition, a 500 KVA DG has been installed to support the power needs.